Sanitary sewer, water supply and storm water networks, roads and site development. Kraków and Lesser Poland.

Reliable, tested sanitary sewers

Sanitary sewer networks

Sanitary sewers: trunk sewers, manholes, service connections and pumping stations — with CCTV inspection and handover.

See the scopeRequest a quote

Reliable, tested water supply networks

Water supply networks

Water mains and service connections in PE pipe, with hydrants, leak testing and disinfection.

See the scopeRequest a quote

Effective storm water drainage

Storm water networks

Site drainage: storm sewers, gullies, soakaways and retention tanks.

See the scopeRequest a quote

Considered, functional use of the space

Site development

Finishing the plot after the utility works: grading, topsoiling, paving blocks, fencing and greenery.

See the scopeRequest a quote

Durable, solid roads built to last

Roads

Estate, access and haul roads — from subgrade and base course to asphalt, concrete or paving block surfaces.

See the scopeRequest a quote

Our work on site

Shored trenches, manholes, tanks and the machines we do it with.

See all projects

How a project runs

From the first site visit to the as-built documentation. The same order for a single connection and for a kilometre of sewer.

01

Survey and quote

We inspect the site, check the ground conditions and the access for machinery. We quote a specific scope, not a range.

02

Design and approvals

We handle the approvals with the utility operators and the coordination meeting. The client gets a complete set of consents, not a to-do list.

03

Works

We move in with our own machinery and our own crew — no subcontractor between us and the deadline. Backfill in layers, compacted and tested.

04

Handover and documentation

CCTV inspection, tightness tests, as-built survey. We close the job with a full set of handover documents.

The machinery we own

The machines are ours, so the schedule does not depend on a rental slot.

Volvo tracked excavator weighing 20 tonnes

Volvo 20 t tracked excavator

Deep trenches for sewer mains and channels.

JCB swing excavator weighing 5 tonnes

JCB 5 t swing excavator

Service connections and trenches in built-up areas.

6-tonne swing excavator with a rotator

6 t swing excavator with a rotator

Manhole installation and utility works.

JCB 3CX backhoe loader

JCB 3CX backhoe loader

Earthworks and loading on tight sites.

1-tonne wheel loader

1 t loader

Works next to buildings and on narrow access roads.

JCB 6-tonne site dumper

JCB 6 t site dumper

Hauling spoil around the site.

Scania tipper truck

Scania tippers, 18 and 20 t

Removing spoil and delivering aggregate.

Truck-mounted crane for unloading pipes and manholes

Truck-mounted crane

Unloading pipes, manholes and tanks.

Padfoot roller for compacting the sub-base

Padfoot roller

Compacting the sub-base layers.

Who we have worked for

MLP Group, EastWave Building Company, Harbor Kraków, Krak-Chem, PHU SOLEN, Dobre Inwestycje. Each of these companies has put in writing what we built for them.

Read the reference letters

4.6

based on 79 reviews on Google

Read the reviews on Google

Pełen profesjonalizm na każdym etapie realizacji. Dziękuję Panie Michale 👍🏻

Domino “Alias”

Blog