Sanitary sewer, water supply and storm water networks, roads and site development. Kraków and Lesser Poland.
Reliable, tested sanitary sewers
Sanitary sewer networks
Sanitary sewers: trunk sewers, manholes, service connections and pumping stations — with CCTV inspection and handover.
Reliable, tested water supply networks
Water supply networks
Water mains and service connections in PE pipe, with hydrants, leak testing and disinfection.
Effective storm water drainage
Storm water networks
Site drainage: storm sewers, gullies, soakaways and retention tanks.
Considered, functional use of the space
Site development
Finishing the plot after the utility works: grading, topsoiling, paving blocks, fencing and greenery.
Durable, solid roads built to last
Roads
Estate, access and haul roads — from subgrade and base course to asphalt, concrete or paving block surfaces.
What we build
Five scopes of work, one contractor: our own machines and our own crew, from the trench to the finished surface.
- RoadsEstate, access and haul roads — from subgrade and base course to asphalt, concrete or paving block surfaces.
- Site developmentFinishing the plot after the utility works: grading, topsoiling, paving blocks, fencing and greenery.
- Storm water networksSite drainage: storm sewers, gullies, soakaways and retention tanks.
- Water supply networksWater mains and service connections in PE pipe, with hydrants, leak testing and disinfection.
- Sanitary sewer networksSanitary sewers: trunk sewers, manholes, service connections and pumping stations — with CCTV inspection and handover.
Our work on site
Shored trenches, manholes, tanks and the machines we do it with.






How a project runs
From the first site visit to the as-built documentation. The same order for a single connection and for a kilometre of sewer.
01
Survey and quote
We inspect the site, check the ground conditions and the access for machinery. We quote a specific scope, not a range.
02
Design and approvals
We handle the approvals with the utility operators and the coordination meeting. The client gets a complete set of consents, not a to-do list.
03
Works
We move in with our own machinery and our own crew — no subcontractor between us and the deadline. Backfill in layers, compacted and tested.
04
Handover and documentation
CCTV inspection, tightness tests, as-built survey. We close the job with a full set of handover documents.
The machinery we own
The machines are ours, so the schedule does not depend on a rental slot.

Volvo 20 t tracked excavator
Deep trenches for sewer mains and channels.

JCB 5 t swing excavator
Service connections and trenches in built-up areas.

6 t swing excavator with a rotator
Manhole installation and utility works.

JCB 3CX backhoe loader
Earthworks and loading on tight sites.

1 t loader
Works next to buildings and on narrow access roads.

JCB 6 t site dumper
Hauling spoil around the site.

Scania tippers, 18 and 20 t
Removing spoil and delivering aggregate.

Truck-mounted crane
Unloading pipes, manholes and tanks.

Padfoot roller
Compacting the sub-base layers.
Who we have worked for
MLP Group, EastWave Building Company, Harbor Kraków, Krak-Chem, PHU SOLEN, Dobre Inwestycje. Each of these companies has put in writing what we built for them.
4.6
Pełen profesjonalizm na każdym etapie realizacji. Dziękuję Panie Michale 👍🏻
Blog

Modern Technologies in Road Infrastructure Construction
Smart materials, BIM, drones and automation change the way roads are built.…

Stages of Road Construction – From Design to Delivery
From the design and permits, through site preparation and the base course,…

Firefighting Water Tanks – Regulations and Technical Requirements
Which rules govern firefighting water tanks, what capacity and materials are required,…








